1887

Abstract

The use of a fast and integrated model work flow is a part of the IOR strategy, and is expected to lead to reduced uncertainty in reserves predictions and accelerated decision processes. Our basic idea is to have a model chain that is consistent, updateable and repeatable. To provide continuously updated and integrated models with reduced and quantified uncertainty, an integrated approach to reservoir modelling is required. In our integrated model work flow, the following requirements must be fulfilled: •In the model updating, different kinds of data can be incorporated (production data, pressure data and 4D seismic). •The consistency between the geo- and simulation models is maintained. •Model updating and uncertainty modelling are treated as an integrated process.The uncertainty is represented by an ensemble of realizations that are updated in the history matching. •The work flow must allow for fast model updating. The key is “no user interaction” during the updating process. Great care is taken to make each step in the work flow automatic. The fast and integrated model work flow is developed and demonstrated for the Grane field.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20149329
2011-05-23
2024-04-26
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20149329
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error