1887
PDF

Abstract

Summary

In layered gas reservoirs, respective contribution of each produced layer is determined for efficient and reliable Reservoir Management. The Production Logging Tool (PLT) is commonly used to allocate the production to individual layers. The PLT acquisitions schedule is constrained by cost and logistics, which might prevent to get the desired frequency. Geochemical tools provide additional and reliable data on the hydrocarbon fluid provenance improving accuracy of the layer-based gas rate equations. Geochemical assessment can be done at higher frequencies and at far lower cost between each PLT

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201602327
2016-10-03
2024-04-26
Loading full text...

Full text loading...

/deliver/fulltext/2214-4609/2016/PG06.html?itemId=/content/papers/10.3997/2214-4609.201602327&mimeType=html&fmt=ahah
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201602327
Loading
/content/papers/10.3997/2214-4609.201602327
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error