1887

Abstract

Summary

The choice of an artificial lift method in fields that have been faced with declining production has always been a challenge. Therefore, in this paper, by designing a two-stage screening process and using fuzzy logic approach, it is attempted to select the most accurate method for one of the southwest Iran squares. Fuzzy logic will make the ranking system more accurate and more sensitive to the operating conditions of artificial lift methods. By the method ranking with this screening procedure, Electrical Submersible Pump (ESP) and Sucker Rod Pump (SRP) are selected as the priorities.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.202010242
2021-10-18
2024-04-29
Loading full text...

Full text loading...

References

  1. [1]Hullio, I. A., Jokhio, S. A., Memon, K. R., Nawab, S., & Baloch, K. J. (2018). Design and Economic Evaluation of the ESP and Gas Lift on the Dead Oil Well.
    [Google Scholar]
  2. [2]Kefford, P. A., & Gaurav, M. (2016, September). Well performance calculations for artificial lift screening. In SPE Annual Technical Conference and Exhibition. Society of Petroleum Engineers.
    [Google Scholar]
  3. [3]Lea, J. F., & Nickens, H. V. (1999, January). Selection of artificial lift. In SPE Mid-Continent Operations Symposium. Society of Petroleum Engineers.
    [Google Scholar]
  4. [4]Valbuena, J., Pereyra, E., & Sarica, C. (2016, October). Defining the Artificial Lift System Selection Guidelines for Horizontal Wells. In SPE North America Artificial Lift Conference and Exhibition. Society of Petroleum Engineers.
    [Google Scholar]
  5. [5]Worth, D., Al-Safran, E., Choudhuri, A., & Al-Jasmi, A. (2019). Assessment of artificial lift methods for a heavy oil field in Kuwait.Journal of Petroleum Science and Engineering.
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.202010242
Loading
/content/papers/10.3997/2214-4609.202010242
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error