-
oa Study of the process of changing of the bottom hole pressure in time under the conditions of gaslift flowing
- Publisher: European Association of Geoscientists & Engineers
- Source: Conference Proceedings, International Conference of Young Professionals «GeoTerrace-2020», Dec 2020, Volume 2020, p.1 - 5
Abstract
Summary
The paper puts forward the calculation of the change in time of the minimum downhole pressure of flowing due to the joint interaction of the well and the oil pool under the dissolved gas regime, as well as the method of calculating the conditions of joint operation of the oil pool and the folowing well. The method is based on solving the equations of fluid filtration in the oil pool and the movement of gas-oil flow in the wellbore.
EAGE Publications BV © 2020 The Authors © European Association of Geoscientists and Engineers