1887

Abstract

Summary

Seismic data volumes are increasing and pressure is growing to accelerate the turnaround time of seismic processing projects. Testing, validation and production administration are time consuming components of a project. Testing is performed to optimize the parameters for each step in the processing sequence. It can be both computer and human resource intensive, as many testing phases require numerous repeat runs and significant interaction with the data. A Proof-of-Concept (POC) example illustrates that parameter testing can be helped by mining for parameters from a database.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.202130005
2021-02-23
2024-04-29
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.202130005
Loading
/content/papers/10.3997/2214-4609.202130005
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error