Full text loading...
-
Large-scale pore pressure prediction after pre-stack depth migration in the Caspian Sea
- Source: First Break, Volume 25, Issue 9, Sep 2007,
-
- 01 Sep 2007
- Previous Article
- Table of Contents
- Next Article
Abstract
It is vital to the planning of drilling wells to have an estimate of the expected pressure regime to be encountered in the subsurface. Direct concerns are the safety of the personnel and equipment, in particular minimising the associated risks. Furthermore, it facilitates more effective planning and ordering of the required material. With respect to the reservoir, the right drilling mud weight is important. If it is too low, a blow out might occur and conversely, if it is too high, the formation might be damaged by invasion of the drilling fluid.
EAGE Publications BV