1887

Abstract

Qatargas 2 is the world’s first and largest, fully integrated value-chain Liquefied Natural Gas (LNG) project. The<br>cornerstones of the Qatargas 2 Project are the two LNG mega-trains (Trains 4 and 5), in the State of Qatar, each with a design<br>LNG production capacity of 7.8 million tonnes per annum (MTA), which is 50% larger than conventional trains currently in<br>operation. To receive the LNG, Europe’s largest LNG terminal, the South Hook regasification facilities, were constructed in<br>Milford Haven, Wales to supply the United Kingdom (UK) national gas grid. The Qatargas 2 LNG trains produced their first<br>LNG in March and September, 2009, respectively.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.151.iptc13707
2009-12-07
2024-12-06
Loading full text...

Full text loading...

/content/papers/10.3997/2214-4609-pdb.151.iptc13707
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error