1887

Abstract

Field BY Coiled Tubing (CTU) Operation comprised of 2 wells to be cleaned out and perforated that are A1 and A4.<br>These two wells target reservoir was untapped and has good potential of increasing gas production rate from BY<br>Field.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.280.iptc14407_noPW
2012-02-07
2024-04-29
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.280.iptc14407_noPW
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error