1887

Abstract

Operating Platong field in the Gulf of Thailand (GoT) is challenging because of the small compartmentalized reservoirs in the<br>fluvial deposition environment. As the completion strategy has to be low cost in order to achieve the economic hurdle rate and<br>the initial strategy is to develop to be a gas field, a lot of existing oil wells do not have the artificial lift system in place.<br>Without artificial lift, most of the oil wells usually cease flowing in 2-6 months. Therefore, the artificial lift is crucial to<br>prolong the well life in Platong. Gas lift currently plays a very important role in Platong field. With the continuous initiation<br>and operation improvement, production from Platong gas lifted wells has been gradually increasing from 10% in June 2008 to<br>50% of total field production in June 2011.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.280.iptc14807_noPW
2012-02-07
2024-04-27
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.280.iptc14807_noPW
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error