Full text loading...
-
Gas Lift Journey to Maximize the Asset Value in Platong Field, Gulf of Thailand
- Publisher: European Association of Geoscientists & Engineers
- Source: Conference Proceedings, IPTC 2012:International Petroleum Technology Conference, Feb 2012, cp-280-00182
Abstract
Operating Platong field in the Gulf of Thailand (GoT) is challenging because of the small compartmentalized reservoirs in the<br>fluvial deposition environment. As the completion strategy has to be low cost in order to achieve the economic hurdle rate and<br>the initial strategy is to develop to be a gas field, a lot of existing oil wells do not have the artificial lift system in place.<br>Without artificial lift, most of the oil wells usually cease flowing in 2-6 months. Therefore, the artificial lift is crucial to<br>prolong the well life in Platong. Gas lift currently plays a very important role in Platong field. With the continuous initiation<br>and operation improvement, production from Platong gas lifted wells has been gradually increasing from 10% in June 2008 to<br>50% of total field production in June 2011.