1887
PDF

Abstract

Challenges associated with cementing horizontal wellbores, as well as the higher operational time and costs<br>associated with the cemented liner, plug and perf method, has resulted in many operators switching to open hole<br>multi-stage system (OHMS) completions. In addition, production increases have been realized with OHMS due to<br>access to the entire open hole lateral.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.280.iptc15267_noPW
2012-02-07
2024-04-26
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.280.iptc15267_noPW
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error