1887

Abstract

In northern Oman, a project for twelve horizontal wells required drilling optimization in a field that presented various<br>geological, drilling, and well construction challenges, including inter-bedded shales, abrasive reservoir, severe stick/slip,<br>sidetracking issues, and low rates of penetration (ROP).

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.280.iptc15281_noPW
2012-02-07
2024-04-26
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.280.iptc15281_noPW
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error