1887

Abstract

Gas production has increased due to increasing in demand of energy worldwide. Flow assurance studies in transport systems<br>related to offshore pipelines must be performed since the design in order to reduce operational costs and failures. This paper<br>presents the flow assurance study of a hydrocarbon pipeline of 120 km, which transports 650 MMscfd of gas production from<br>offshore fields to onshore facilities. Fluidynamics parameters were studied in order to optimize internal diameter and process<br>equipment required for handling of liquids present in the transport systems.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.280.iptc15287_noPW
2012-02-07
2024-04-26
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.280.iptc15287_noPW
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error