1887

Abstract

The combination of planning, personnel and technology enabled achievement of the well results. Geosteering techniques proved and accessed 600m md of additional pay zone which conventional technologies and techniques would not have accessed. Analysis of deep directional resistivity data raised confidence of seismic inversion data during and after drilling.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20131559
2013-09-22
2024-10-03
Loading full text...

Full text loading...

/content/papers/10.3997/2214-4609.20131559
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error