1887

Abstract

An updating strategy is designed to iteratively close the loop (CtL) between the fluid flow simulation predictions and measured production history, predicted and observed 4D seismic data, and finally predicted and inverted impedance/impedance changes. The central ingredient in this scheme is the computation of elastic property changes that are inverted from the seismic in an engineering-consistent (EC) manner. The geometry, volumetrics and transmissibility multipliers for the reservoir model are updated in three successive stages by sequential comparison between the seismic and fluid flow domains. The EC-CtL workflow is implemented on a West African field, where reservoir model improvements are obtained in combination with a consistency between model, impedance and seismic domains.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20132057
2013-11-17
2024-04-26
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20132057
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error