1887

Abstract

The computation time estimates of the seismic data processing parallel programs depending on the number of computing processes and the data distribution strategy are proposed. The estimates help to optimize the parallel program execution in the specific software/hardware architecture on the base of few experiments as well as to fit optimal architecture for solving typical seismic data processing problems.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20146945
2008-04-07
2024-04-26
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20146945
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error