We have carried out the geodetic monitoring of the hotel complex. The purpose of this study was to ensure control of the mutual height position of the sectional blocks of the building over the period from 01.07.2019 to 30.11.2019. At this facility, was designed a leveling network consisting of 2 stages. Using the method of high-precision geometric leveling with a short beam, we measured the excess between the deformation marks of the basement, stairways and sites of the hotel complex. By means of specially developed software packages and databases, we calculated the values that characterize the process of subsidence of building elements.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.20205705
2020-12-07
2024-04-28
Loading full text...

Full text loading...

/deliver/fulltext/2214-4609/2020/geoterrace-2020/GeoTerrace-2020-005-Romaniuk.html?itemId=/content/papers/10.3997/2214-4609.20205705&mimeType=html&fmt=ahah

References

  1. BurakK. O.
    Doslidzhennia mozhlyvostei avtomatyzatsii urivniuvannia spetsialnykh nivelirnykh merezh pry dopomozi suchasnoho prohramnoho zabezpechennia / Kostiantyn Burak // Zhurnal «Inzhenerna heodeziia». Kyiv - 2002. - Vyp.42. - s.16–23.
    [Google Scholar]
  2. BurakK.O.
    Rozrobka proektu sposterezhen za osidanniam fundamentiv budivel i sporud na promyslovomu obiekti. Kursove proektuvannia –Ivano-Frankivsk: IFNTUNH, 2010. - 83 s
    [Google Scholar]
  3. DBN V.1.3-2-2010.
    [Google Scholar]
  4. Heodezychni roboty v budivnytstvi. – Kyiv, Minenerhobud Ukrainy, 2010.
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.20205705
Loading
/content/papers/10.3997/2214-4609.20205705
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error