1887

Abstract

Summary

There is a tendency to complicate drilling techniques in the Russian Federation and in the world. It is caused by increase the number of horizontal wells and increase the length of the laterals. Casing with thread connections while run in hole operation in deviated and horizontal wells are subjected to combined loads caused by axial load, bending load, differential pressure. The most critical point of casing string is the thread connection. 50%-80% compression efficiency of connection becomes insufficient. This article describes results of FEA (finite element analysis) for API Buttress and TMK UP CWB connections and full scale test for TMK UP CWB 177.8 х 9.19 N80.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.202154082
2021-05-24
2024-04-26
Loading full text...

Full text loading...

References

  1. 1.С.А.Рекин, А.РАгишев, А.Р.НургалеевБурение на обсадной колонне. Анализ усталостной прочности премиального соединения труб, Oil&Gas Journal Russia, Декабрь2019
    [Google Scholar]
  2. 2.M.A.Miner. Cumulative Damage in fatigue // Journal of Applied Mechanics, Sept. 1945..
    [Google Scholar]
  3. 1.S.A.Rekin, A.R.Agishev, A.R.NurgaleevDrilling with Casing.Fatigue Analysis Premium Connection, Oil&Gas Journal Russia, December 2019
    [Google Scholar]
  4. 2.M.A.Miner. Cumulative Damage in fatigue // Journal of Applied Mechanics, Sept. 1945..
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.202154082
Loading
/content/papers/10.3997/2214-4609.202154082
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error