Full text loading...
-
Prediction ahead of the tunnel face by seismic methods - pilot project in Centovalli Tunnel, Locarno, Switzerland
- Source: First Break, Volume 10, Issue 1, Jan 1992,
-
- 01 Jan 1992
- Previous Article
- Table of Contents
- Next Article
Abstract
In planning the construction of a tunnel, a geological prognosis is necessary. The reliability of the prognosis is directly related to the amount of information available from surface geology, drillholes and geophysical surface investigations. During the excavation phase the tunnel engineer requires detailed and quantitative information about abrupt changes in rock quality and formation boundaries lying ahead, and these cannot always be obtained from surface investigations.
EAGE Publications BV