1887

Abstract

H-02 ANALYSIS OF SEISMIC RECORDINGS DURING INJECTION USING IN-WELL PERMANENT SENSORS O. BARKVED 1 E. GAUCHER 2 B. HORNBY 3 T. KRISTIANSEN 1 and C. MAISONS 2 Introduction 1 During re-completion of the Valhall A-25B T3 well in the end of July 2001 a permanent in-well seismic monitoring system was deployed. This well was initially completed as a horizontal deep flank producer but was later converted to a waste injector due to poor performance. Waste primarily drill cuttings is slurrified and injected at limited volumes and rates as needed. During drilling the injection will normally last for 2-3 hours twice

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609-pdb.5.H002
2002-05-27
2024-04-26
Loading full text...

Full text loading...

http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609-pdb.5.H002
Loading
This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error